1. hand excavation for foundations and underground pipe
  2. backfilling work for foundations and underground pipe
    Lean concrete C20
    Ordinary concrete C30
  3. Shuttering works using new plywood
  4. construct 350mm sq. block with insert plate and perform the installation in
    accordance with the drawing.
  5. Ditto but 20 tones ditto
  6. Providing and installing the 6″ PVC underground pipe
    Providing and installing the 4″ down PVC pipe.
    Providing and installing the 6″ round line gutter.
    provision, fabrication, and installation of steel square pipe(100x100x5mm) as per attached sketch.
  7. provision, fabrication, and installation rectangular square pipe(800x400x3mm) as per the attached sketch.
    provision and installation of steel corrugated sheet.
  8. blasting and painting work for all shelters and covered walkway members.
SiteTawke-CPF camp
Completed31 August 2019