1. Removing solid material and cleaning the pit solid material will be transported to the Pit No-7.
2. Providing, laying and compacting the pit by clean soil at 25cm per layer to fill the pit.
3. Lifting the waste water from the pit#7 to the pit #1 by vacuum truck.