Brick wall for culver road crossing of 12″export pipeline.

It is requested to carry out the following

  1. To construct a brick wall of 1 M in height and 14M in length on the existing wall of culvert {road crossing of 12″ export pipeline at KM-33.5 Km location.
  1. To supply one truck of soft sand to cover around the 12″ export pipeline that buries the section after wrapping repair.
SiteKm-33.5km
Completed06 September 2017