shelters to be installed above the 2x Diesel Generators Fabrication & installation of generator shelters. Painting of the structure as per DNO specifications. The terminal is an operating site and a shutdown of the window of the pumping facility can be arranged if required for the installation of the shelters.

Fabrication & installation of 2x sets of stairs for the LER Supply, construction & installation of 8x pre-cast foundations. Gratings clips shall be used for fixing grating panels. All gratings used to be pre-galvanized & “Type-I or Type-III” as per the attached grating specification. Painting of all structures to be as per DNO specifications. All handrails are to be painted with “RAL 1023” Traffic Yellow color. One set of stairs is to be located on the West side of the LER and one set of stairs is to be located on the North East side of the LER

SiteIraq oil :tawke licence block
Completed28 March 2019